|
|
|
| We have rigs specifically designed for large diameter and deeper holes with 2000cfm of air which is needed for larger holes. All drilling is done with a high volume, high pressure air rotary drill rig. A large diameter down-the-hole hammer will be used to achieve maximum fracturing of the rock formations. We run the most modern and newest hammers on the market. Our hammer/ stabilizer gives full stability to properly align the borehole. When installing casing in the production well, the hole is drilled 1.5 inches larger than the outside diameter of the casing. This is to allow for a trimming pipe for the placement of cement grout as required by the Department of Environmental Protection. We have the experience, equipment, and efficiency to complete every job correctly and quickly. |
|
Send mail to Raabweb@aol.com with
questions or comments about this web site.
|